Long Auger Drilling Rig: Professional Construction Equipment Structure and Installation Guide

Publication Date: Jun 28, 2025

As a professional technical expert in the construction machinery field, I will provide a detailed introduction to the structural composition and installation procedures of the long auger drilling rig. The long auger drilling rig is a highly efficient and stable foundation construction equipment widely used in building, bridge, and other foundation engineering projects.

IMG_0093.jpg

1. Core Components of the Long Auger Drilling Rig

The long auger drilling rig primarily consists of the following components:

Top Pulley Assembly: Used for lifting the power head, reinforcement cage, and grouting pipe

Folding Mast: Box-section structure with flange connections for easy transportation

Diagonal Brace: Enhances mast stability and ensures construction safety

Hydraulic Crawler Chassis: Provides stable support and adapts to complex terrain

Rotation Mechanism: Drives the drill pipe rotation for efficient drilling

Winch Mechanism: Controls wire rope lifting for pile foundation construction

Hydraulic System: Powers the entire machine and ensures coordinated operation

Electrical System: Enables automated control for improved operability

The long auger drilling rig is designed to balance construction efficiency and transport convenience. Its folding mast can be quickly raised or lowered via hydraulic cylinders, eliminating the need for disassembly during transportation.

IMG_0149.jpg

2. Installation and Debugging Procedures for the Long Auger Drilling Rig

To ensure the long auger drilling rig operates correctly, follow these installation and debugging steps:

Step 1: Stabilizing the Outriggers and Chassis

(1) Install outrigger pads and chassis extension seats to ensure stability

(2) Secure the front outriggers and prepare wooden sleepers for additional support

Step 2: Hydraulic System Debugging

(1) Start the oil pump and retract the outrigger cylinders to ground the chassis

(2) Check hydraulic system pressure and ensure no leaks

Step 3: Mast Installation

(1) Retract the lifting cylinder to move the mast backward until vertical

(2) Connect the lower mast section to the support and tighten flange bolts

(3) Extend the lifting cylinder to raise the mast to working position

(4) Install diagonal braces to enhance mast stability

Step 4: Power Head and Drill Pipe Installation

(1) Install the power head and test its electrical connections for smooth sliding

(2) Install the drill pipe and guide tube, ensuring blade interfaces are aligned

(3) Conduct a test run to observe drill pipe operation and make adjustments if needed

Step 5: Full Machine Debugging

(1) Test the walking and rotation mechanisms for proper function

(2) Check brake responsiveness and directional control accuracy

(3) Confirm stable operation of hydraulic and electrical systems

IMG_9971.jpg

3. Advantages of the Long Auger Drilling Rig

The long auger drilling rig is the preferred equipment for pile foundation construction due to its efficiency and reliability:

High Construction Efficiency: Simultaneous rotation and lifting of the drill pipe enable fast pile formation

Strong Adaptability: Suitable for various geological conditions, including soft soil and sandy layers

Easy Operation: Precise control via hydraulic and electrical systems

Convenient Transportation: Folding design reduces assembly and disassembly time

产品图1.jpg

Related News
Read More >>
Bulldozer Blade Types: Core Configuration for Adapting to Different Operating ScenariosBulldozer Blade Types: Core Configuration for Adapting to Different Operating Scenarios
Jul 24, 2025
In earthwork, mining operations, and road construction, bulldozer blade types directly affect equipment efficiency and application range. Different bulldozer blade types feature unique structural designs and functional focuses—choosing the ...
Swamp bulldozer: An Efficient Solution for Operations in Muddy EnvironmentsSwamp bulldozer: An Efficient Solution for Operations in Muddy Environments
Jul 24, 2025
In muddy scenarios such as swamp development, wetland management, and farmland water conservancy transformation, the swamp bulldozer, with its unique low ground pressure design and strong power, has become a core equipment to break through t ...
Rough terrain forklift with highest load capacity: A High-performance Solution for Heavy-duty Outdoor OperationsRough terrain forklift with highest load capacity: A High-performance Solution for Heavy-duty Outdoor Operations
Jul 24, 2025
In scenarios such as heavy-duty mine transportation, large equipment loading/unloading, and infrastructure material handling, the rough terrain forklift with highest load capacity has become a core hub connecting the material supply chain an ...
All products are guaranteed for 12 months!